Whole-Home Renovation in New Port Richey, FL | Jess Remodeling
Finished New Port Richey kitchen with light blue shaker cabinets, quartz counters and plank flooring
Whole-home renovation · New Port Richey, FL

Whole-Home Renovation in New Port Richey: Back to Block and Studs

This house was not freshened up. The interior came back to bare concrete block and open framing, and every room was rebuilt from there — kitchen, bathroom, bedrooms and living areas.

Location
New Port Richey, FL
Service
Whole-House Remodeling
Strip-out
To block and studs
Rooms
Kitchen, bath, bedrooms
Flooring
Plank throughout
Before New Port Richey kitchen and living area stripped to concrete block and timber framing
After Finished New Port Richey kitchen with light blue shaker cabinets and brass hardware
Before New Port Richey bathroom during strip-out, with the old tub and toilet against open walls
After Finished New Port Richey bathroom with blue walls, a green vanity and a subway tile tub surround
During Crew member on a ladder working on the opened stud wall between the kitchen and living area
During Crew member removing ceiling framing during the New Port Richey strip-out
After Renovated bedroom with blue-grey walls, a ceiling fan and new plank flooring
After Living area with new plank flooring looking through to the kitchen and stainless refrigerator

Scope of work

  • Strip-outInterior finishes removed back to the concrete block exterior walls and timber partition framing, including the old tub, toilet and kitchen
  • LayoutThe wall between the kitchen and living area opened into a peninsula
  • KitchenLight blue shaker cabinetry, white quartz counters, subway tile backsplash, brass fixtures and stainless appliances
  • BathroomFull-height subway tile tub surround, green vanity, patterned floor tile, arched mirror and brass fixtures
  • Bedrooms and livingNew board, paint, baseboard and ceiling fans, with sliding barn doors in place of swing doors
  • FlooringWood-look plank run continuously from the kitchen through the living space and bedrooms
01

Back to block and studs

Once the finishes were off, nothing behind them was a guess.

Like most houses in this part of Florida, this one has concrete block exterior walls and timber-framed partitions inside. Stripping the interior exposed both, along with the wiring, the plumbing runs and the condition of everything the old finishes had been covering.

That is the point where a renovation stops being a decorating job. The layout can be set around what is actually in the walls, and anything that needs moving gets moved while the walls are still open, not after the new board is up.

1wall opened between the kitchen and living area
Interior stripped back to concrete block and open timber framing during the New Port Richey renovation
02

A kitchen set out around the new opening

Layout first, finishes second.

With the wall to the living area opened, the kitchen became a peninsula layout facing the rest of the house instead of a closed room. The sink and range runs were set against the services that were already visible, which keeps the plumbing and electrical changes to what the layout genuinely needed.

The finishes went in after that was fixed: light blue shaker fronts with brass pulls, white quartz counters, a subway backsplash taken up to the underside of the uppers and a brass pull-down faucet.

4stainless appliances built into the new layout
The new peninsula opening between the kitchen and living area, with a pendant light above
03

A bathroom rebuilt from the block out

The tub, the window and the wet wall agreed as one decision.

With the bathroom back to block and framing, the tub, the window reveal and the plumbing wall had to be settled together. A tub surround is one of the few places in a house where the substrate, the waterproofing and the tile are effectively a single choice.

White subway tile now runs the full height of the surround and around the window. Against it sit a dark green vanity, blue-grey walls, brass fittings and a patterned floor tile, so the room has its own character rather than echoing the kitchen.

Full heightsubway tile around the tub and window
Finished bathroom with a green vanity, arched mirror, patterned floor and tiled tub surround
04

Bedrooms, doors and one floor throughout

The rest of the house finished to the same standard.

The living area and bedrooms got new board, paint, baseboard and ceiling fans. The flooring is a wood-look plank laid as one continuous run from the kitchen through the living space and into each bedroom, so there are no thresholds or changes of material between rooms.

Sliding barn doors replace swing doors on the bedrooms. They run on black track and open without taking floor space, which matters in rooms where a door swing would cut into the furniture layout.

1continuous floor from the kitchen to the bedrooms
White sliding barn door on black track opening into a renovated grey bedroom
On film

Walk through the house, then hear from the homeowner

The walkthrough follows the same rooms from bare block to handover.

Project walkthroughDemolition to finished rooms
Client testimonialThe homeowner on the project
A whole-home renovation is one job done in the right order, not five jobs done back to back.

Rough plumbing and electrical go in while the walls are open. Board goes up once the rough-in is right. Flooring goes down after the messy trades are finished, in one continuous run. Get that order wrong and the same wall gets opened twice, or a new floor gets ruined by the trade that should have been out of the house already.

Next step

Tell us what you want to change

Every project starts with a site visit and an honest answer about what is worth doing.

We walk the house, look at what is behind the finishes, and tell you whether the money is better spent on surfaces or on structure.